2.1 Understanding GP3 (DNSH Requirement)
- What is “Do No Significant Harm” (DNSH)
- Regulatory expectations & documentation
2.2 Construction & Infrastructure Lifecycle Risk Mapping
- Pre-Construction / Design Stage
- Land use, site selection, EIA approval, biodiversity impact
- Construction Stage
- Air pollution (dust), noise, waste generation
- Water management, soil erosion
- Operation / Usage Stage
- Energy consumption (buildings, infrastructure)
- Maintenance impact, emissions
- End-of-Life / Decommissioning
- Demolition waste
- Material recycling / disposal
2.3 Identifying Key Environmental Risks in Manufacturing
- Land degradation & biodiversity loss
- Carbon-intensive materials (cement, steel)
- Construction waste & pollution
- Energy inefficiency in buildings/infrastructure
Sector-specific examples:
- Property development
- Highways / transport infrastructure
- Industrial parks
2.4 Risk Controls & Validation
- EIA approvals, environmental permits
- Green certifications (e.g. GreenRE, LEED)
- Contractor practices & monitoring systems
- Third-party verification vs internal claims
2.5 Case Study 1 & 2 (Progressive Learning)
- Case 1: Identify GP3 risks and risk management across construction and infrastructure sectors
- Case 2: Extract from Sustainability Report from PLC, to identify adequacy of environment risk controls & gaps
- Output: Structured GP3 assessment template